Togo’s government has prioritised the protection of a landscape as part of a large-scale road upgrade that passes through it.
Running between Bassar in central Togo and Tindjassé at the border with Ghana, the 90km section of road goes through natural heritage sites such as the Fazao-Malfakassa National Park.
Construction company FB Group has been commissioned to deliver the project by Togo’s Ministry of Public Works and Infrastructure.
It is working with two RKS Group companies – RSK International Projects Group (IPG) and Stephenson Halliday – on environmental compliance of the proposed new road, which will replace deteriorating tracks prone to flooding and erosion with constructed asphalt surface expected to last for two decades.
UK-based environmental planning, landscape architecture, and impact assessment consultancy Stephenson Halliday is also delivering a landscape and visual impact assessment for the road upgrade, which its associate director (landscape) Rosemary Walker says acts as a gateway to the national park when approaching from the north-west as well as an important transport route for business and trade in the region.
“The project has the potential to unlock regional transformation across Bassar and the Mô Plain, supporting long‑term economic and social development in this part of Togo. The improved physical connectivity boosts economic and social integration by facilitating trade and enabling better and more reliable all-weather access to services such as healthcare, education and markets.”
The proposed road runs alongside the national park for 26km, so Walker says a sensitive design approach was recommended to avoid vegetation loss and construction work being in view.
“From our experience, when design is done well and sensitively, it helps a road to feel like it has always been there, naturally fitting into the surrounding landscape. Where a road or other infrastructure is barely noticed or seems to fit in the area, this means that good design is doing its job.”




0 Comments